Kitchen remodeling, planned to the week.
A kitchen remodel in Southwest Florida runs 6–10 weeks of construction after 2–4 weeks of design and permitting. Condo buildings add 3–5 weeks of board review. Your written planning range is delivered at the free design session — before any contract.
- Construction time
- 6–10 weeks
- Design + permitting
- 2–4 weeks before demo
- Condo board review
- add 3–5 weeks
- Your planning range
- In writing, at the free session
What the scope covers.
Layout & walls
Open-plan conversions, island additions, structural review and beam detail where needed.
Cabinetry & storage
Custom and semi-custom lines, panel-ready appliances, pantry and pull-out systems.
Counters & surfaces
Quartz, quartzite and stone — templated, fabricated and installed by our own schedule.
Electrical & lighting
Layered lighting plans, under-cabinet runs, dedicated appliance circuits, code upgrades.
Plumbing & fixtures
Relocations, pot fillers, filtration and disposal — permitted and inspected.
Flooring & finish
Sound-rated assemblies for condos, tile and wide-plank, paint, trim and final detailing.
Phase by phase, to the week.
Discover
WEEK 0Design
WEEKS 1–4Plan
WEEKS 4–6Build
WEEKS 6–18Follow
THROUGHOUTComplete
FINAL WEEKWhere we build it.
Questions about kitchen remodeling
How long does a kitchen remodel take?+
6–10 weeks of construction for most projects, after 2–4 weeks of design and permitting. Appliance and cabinet lead times are locked during Plan so the build never waits on deliveries.
What drives the cost of a kitchen remodel?+
Scope first, finish level second, building type third, access fourth. You receive a written planning range for your specific kitchen at the free design session — before any contract.
Can you remodel a kitchen in a high-rise condo?+
Yes — it's a specialty. Board package, elevator reservations, sound-rated flooring and work-hour plans are handled before demo day. Check the HOA Approval Library for your building.
Do I need to move out?+
Most clients stay — or are away for the season. We isolate the work zone, protect paths and set up a temporary kitchen station when the layout allows.
Do you handle permits and inspections?+
Yes. Collier or Lee County permit sets are prepared and filed by us, and we manage every inspection through final sign-off.