Exterior paint that survives the salt.
Surveyed, repaired and coated for salt and sun, with the HOA color approval filed before we schedule the crew.
Exterior painting on the Gulf coast is a coatings problem before it is a colour problem. Salt, UV and humidity break down a builder-grade film in 4–6 years. Colour for 2026 Gulf light is specified after the survey, not a catalogue default.
- Construction time
- 1–3 weeks
- Typical scope
- Stucco · trim · soffit · doors
- HOA color approval
- Filed before we schedule
Get a free concept and a planning range
Rather talk? (239) 441-4676
- Based in Naples since 2020
- Condo board and permits handled in-house
- A real person replies the same business day
- Planning range in writing before any contract
What the scope covers.
- S-01
Wash & survey
Pressure wash, then a walk of every elevation for chalking, hairline stucco cracks and failed caulk joints — the things that make a new coat fail early.
- S-02
Stucco repair
Cracks cut, patched and textured to match before any primer. Paint does not bridge a moving crack.
- S-03
Seal & prime
Masonry primer on bare stucco, bonding primer on chalked surfaces, and every window and door joint re-caulked.
- S-04
Coating system
Elastomeric where the wall needs to move and breathe, 100% acrylic where it does not. Chosen per substrate, not per price sheet.
- S-05
Trim, soffit & doors
Fascia, soffit, garage and entry doors finished to a different sheen so the elevation reads properly from the street.
- S-06
Color & approval
Colors drawn down on your own wall and tested at midday and dusk, then submitted to the board with the paperwork they ask for.
What's different about an exterior repaint in Southwest Florida.
- Salt and UV. The coating system is chosen per substrate: elastomeric where the wall needs to move, 100% acrylic where it does not.
- HOA color approval. Colors are tested on your own wall and filed with the board before we schedule the crew.
- The rainy season. Coatings need a dry window either side of application, so summer work runs elevation by elevation.
- While you are away. Access is arranged with your property manager, with photos of each elevation as it finishes.
Phase by phase, start to finish.
- 01Discover
- 02Design
- 03Plan
- 04Build
- 05Follow
- 06Complete
“Isaiah and his team did a fantastic job! They were able to get the entire project done in a challenging timeline….”
“I am an interior designer and Pro Squad just finished installing a new floor for a customer. When the workers found mold they notified me and took care of the problem for an agreed upon amount. They repaired or replaced walls and completed that work and the flooring work promptly. They sent me photos throughout the project. The quality of the work was perfect and my customer and I were very pleased. I definitely recommend Pro Squad for your home projects.”
“Great Company. Great people to do business. Very happy and satisfied with Pro Squad Renovations. I would recommend to my friends”
Questions about exterior painting
How often does an exterior need repainting here?+
Five to seven years for a properly specified system, three to four for builder-grade paint. West-facing and waterfront elevations always go first.
Who handles the HOA colour submission?+
We do, before the crew is scheduled. A board that meets monthly can hold a job longer than the painting itself takes.
How do you pick an exterior colour for 2026?+
After the survey. West and waterfront elevations take more sun and salt, so the coating system comes first. Colour direction follows the building, not a catalogue default.
Schedule a visit so we can see the work.
We come look at the rooms and put a planning range in writing — no obligation.
NO OBLIGATION · WE REPLY SAME BUSINESS DAY