Exterior paint that survives the salt.

    SHORT ANSWER

    Exterior painting on the Gulf coast is a coatings problem before it is a colour problem. Salt, UV and humidity break down a builder-grade film in 4–6 years. Colour for 2026 Gulf light is specified after the survey, not a catalogue default.

    Editorial visualization of a Naples-area home exterior after a refined paint refresh. Concept only; not a finished Pro Squad job.
    Construction time
    1–3 weeks
    Typical scope
    Stucco · trim · soffit · doors
    Time on site
    1–3 weeks
    HOA colour approval
    Filed before we schedule
    Your planning range
    In writing, at the free session
    01

    What the scope covers.

    S-01

    Wash & survey

    Pressure wash, then a walk of every elevation for chalking, hairline stucco cracks and failed caulk joints — the things that make a new coat fail early.

    S-02

    Stucco repair

    Cracks cut, patched and textured to match before any primer. Paint does not bridge a moving crack.

    S-03

    Seal & prime

    Masonry primer on bare stucco, bonding primer on chalked surfaces, and every window and door joint re-caulked.

    S-04

    Coating system

    Elastomeric where the wall needs to move and breathe, 100% acrylic where it does not. Chosen per substrate, not per price sheet.

    S-05

    Trim, soffit & doors

    Fascia, soffit, garage and entry doors finished to a different sheen so the elevation reads properly from the street.

    S-06

    Colour & approval

    Colours drawn down on your own wall and tested at midday and dusk, then submitted to the board with the paperwork they ask for.

    02

    Phase by phase, to the week.

    01

    Discover

    WEEK 0
    02

    Design

    WEEKS 1–4
    03

    Plan

    WEEKS 4–6
    04

    Build

    WEEKS 6–18
    05

    Follow

    THROUGHOUT
    06

    Complete

    FINAL WEEK
    The full process, with the five written guarantees →

    Questions about exterior painting

    How often does an exterior need repainting here?+

    Five to seven years for a properly specified system, three to four for builder-grade paint. West-facing and waterfront elevations always go first.

    Who handles the HOA colour submission?+

    We do, before the crew is scheduled. A board that meets monthly can hold a job longer than the painting itself takes.

    How do you pick an exterior colour for 2026?+

    After the survey. West and waterfront elevations take more sun and salt, so the coating system comes first. Colour direction follows the building, not a catalogue default.

    SCHEDULE A VISIT — NO OBLIGATION

    Schedule a visit so we can see the work.

    We come look at the rooms and put a planning range in writing — no obligation.

    NO OBLIGATION · WE REPLY SAME BUSINESS DAY
    (239) 298-4544Schedule a visit