Six phases. Everything in writing.
From free session to walkthrough: kitchens usually run 12–16 weeks, full condos 20–26, including approvals and permits. Design, board review and permitting run in parallel — and your completion walkthrough is a dated line in the signed schedule.
The process, phase by phase.
Discover
A walkthrough of your property and your goals — in person, or over video with your property manager if you're away. We study your photos before we arrive.
You get: first ideas, a clear next step and no sales deck.
Design
Concept board, drawings and selections until the plan looks like you. Approved in the studio or remotely, at your pace.
You get: an approved concept board and a locked selections list.
Plan
Collier or Lee County permits, HOA/board package, elevator and access logistics, and a written dated schedule — all before demolition.
You get: a written scope, dated schedule and planning range.
Build
One crew, one schedule, a protected and discreet site. Photo logs every Friday and no mystery subcontractors.
You get: weekly updates you can read in two minutes.
Follow
Approvals, selections and site decisions handled from wherever you are — clear A-or-B options with photos and deadlines.
You get: same-day decisions, documented in writing.
Complete
Walkthrough on your arrival day, punch list driven to zero, final cleaning and detailing before you land.
You get: a finished home, its documents and the warranty.
The five guarantees, signed before demolition.
The number, before the contract
Your written planning range is delivered at the free session — you decide with the number in hand, not after a deposit.
The walkthrough date, in the schedule
Your completion walkthrough is a dated line in the signed schedule — planned around your season, not ours.
Written change orders
Scope changes are documented with pricing and require approval before the added work begins.
A clean, discreet site
Daily protection and cleanup, quiet-hours plans, crews your neighbors won't mind — written into the site plan.
Warranty in writing
Punch list to zero at walkthrough, warranty handed over with your documents — not a handshake.
PENDING FINAL LEGAL/OPERATIONS APPROVAL BEFORE THESE APPEAR IN CONTRACT DOCUMENTS
Away for the season? Built for that.
- ✓Design sessions over video, with your property manager or estate manager on site.
- ✓Board packages and county permits prepared and filed by us — never handed back to you.
- ✓A photo log and plain-English update every Friday, on your phone.
- ✓Decisions as A-or-B options with photos: approve by text, same day, and the schedule holds.
Concept before demolition
No wall comes down before you've approved what replaces it — on paper.
Everything in writing
Scope, schedule, planning range and warranty — documents, not promises.
One number to call
Designers, builders and permit runners under one roof, one accountability.
Questions about the process
How long does the whole process take?+
From free session to walkthrough: kitchens usually 12–16 weeks, full condos 20–26 including approvals and permits. Board review and permitting run in parallel with design, never after it.
When do I find out what it costs?+
At the free design session, in writing. You get a planning range specific to your property before any contract — and detailed pricing once the scope is locked in the Plan phase.
Who is actually on my project?+
One team: the designers who drew it, the builders who execute it, and a single project lead as your point of contact. No subcontracted project management.
What if I want to change something mid-build?+
Changes are priced and signed before the work happens. You'll never receive an invoice for a decision you didn't approve in writing.
Do you handle HOA approvals and permits?+
Yes, both, in-house during the Plan phase — including the sound certificates, insurance documents and elevator reservations most boards require.
Schedule a visit so we can see the work.
We come look at the rooms and put a planning range in writing — no obligation.
NO OBLIGATION · WE REPLY SAME BUSINESS DAY