Snowbird season is here. Plan your remodel while you're in Naples, we build it while you're away. How it works

    How a remodel with us actually runs.

    Six phases, each with something you get in hand. Nothing is built until you've seen it and the number is on paper.

    SHORT ANSWER

    Six steps, from a free design session to a dated walkthrough. Nothing is built until you have seen the design and the number is on paper, board review and permits run alongside design, and your walkthrough date is written into the signed schedule.

    • Based in Naples since 2020
    • Condo board and permits handled in-house
    • A real person replies the same business day
    • Planning range in writing before any contract

    The process, phase by phase.

    1. 01

      Discover

      A walkthrough of your property and your goals — in person, or over video with your property manager if you're away. We study your photos before we arrive. You get: first ideas, a clear next step and no sales deck.

    2. 02

      Design

      Concept board, drawings and selections until the plan looks like you. Approved in the studio or remotely, at your pace. You get: an approved concept board and a locked selections list.

    3. 03

      Plan

      Collier or Lee County permits, HOA/board package, elevator and access logistics, and a written dated schedule — all before demolition. You get: a written scope, dated schedule and planning range.

    4. 04

      Build

      One crew, one schedule, a protected and discreet site. Photo logs every Friday and no mystery subcontractors. You get: weekly updates you can read in two minutes.

    5. 05

      Follow

      Approvals, selections and site decisions handled from wherever you are — clear A-or-B options with photos and deadlines. You get: same-day decisions, documented in writing.

    6. 06

      Complete

      Walkthrough on your arrival day, punch list driven to zero, final cleaning and detailing before you land. You get: a finished home, its documents and the warranty.

    In writing, or it doesn't count.

    The five guarantees, signed before demolition.

    G-01

    The number, before the contract

    Your written planning range is delivered at the free session — you decide with the number in hand, not after a deposit.

    G-02

    The walkthrough date, in the schedule

    Your completion walkthrough is a dated line in the signed schedule — planned around your season, not ours.

    G-03

    Written change orders

    Scope changes are documented with pricing and require approval before the added work begins.

    G-04

    A clean, discreet site

    Daily protection and cleanup, quiet-hours plans, crews your neighbors won't mind — written into the site plan.

    G-05

    Warranty in writing

    Punch list to zero at walkthrough, warranty handed over with your documents — not a handshake.

    Pending final legal/operations approval before these appear in contract documents

    Away for the season? Built for that.

    • Design sessions over video, with your property manager or estate manager on site.
    • Board packages and county permits prepared and filed by us — never handed back to you.
    • A photo log and plain-English update every Friday, on your phone.
    • Decisions as A-or-B options with photos: approve by text, same day, and the schedule holds.
    Try the Season Timeline Planner →
    RULE 01

    Concept before demolition

    No wall comes down before you've approved what replaces it — on paper.

    RULE 02

    Everything in writing

    Scope, schedule, planning range and warranty — documents, not promises.

    RULE 03

    One number to call

    Designers, builders and permit runners under one roof, one accountability.

    NOVEMBER TO APRIL · WHILE YOU'RE IN NAPLES

    Plan it this winter. Come back to it finished.

    Many of our clients spend the summer up north. So we design it together while you're here, and build it while you're gone.

    1. WINTERDesign it together, in person
    2. SPRINGBoard approval and permits filed
    3. SUMMERWe build. Photos every Friday
    4. FALLWalk in to it finished

    Questions about the process

    How long does the whole process take?+

    Construction usually runs 6–10 weeks for a kitchen and 12–20 for a full condo. Design comes first, and board review and permitting run in parallel with it, never after it. Your walkthrough date is written into the signed schedule.

    When do I find out what it costs?+

    At the free design session, in writing. You get a planning range specific to your property before any contract — and detailed pricing once the scope is locked in the Plan phase.

    Who is actually on my project?+

    One team: the designers who drew it, the builders who execute it, and a single project lead as your point of contact. No subcontracted project management.

    What if I want to change something mid-build?+

    Changes are priced and signed before the work happens. You'll never receive an invoice for a decision you didn't approve in writing.

    Do you handle HOA approvals and permits?+

    Yes, both, in-house during the Plan phase — including the sound certificates, insurance documents and elevator reservations most boards require.

    Rather walk through it on site? Schedule a visit

    Step 01 starts with a photo.

    Answer four quick questions and send a photo if you have one. A designer looks at your space and sends back:

    1. 1A concept of your room, made from your photos.
    2. 2A planning range in writing, so you know the number early.
    3. 3A realistic timeline, including your condo board.

    Free, no obligation. You keep the concept either way, and we never share your number.

    Free concept · Step 01
    STEP 1 OF 4ABOUT 2 MINUTES
    What are you remodeling?

    What are you remodeling?

    Rather talk? (239) 441-4676

    (239) 441-4676Free concept