Kitchen Remodeling in Bonita Springs.

    SHORT ANSWER

    A kitchen remodel in Southwest Florida runs 6–10 weeks of construction after 2–4 weeks of design and permitting. Condo buildings add 3–5 weeks of board review. Your written planning range is delivered at the free design session — before any contract.

    Construction time
    6–10 weeks
    Design + permitting
    2–4 weeks before demo
    Condo board review
    add 3–5 weeks
    Your planning range
    In writing, at the free session
    01

    What changes in Bonita Springs.

    B-01

    Lee County permits

    A different authority than Naples — filed in-house during the Plan phase with inspections managed to sign-off.

    B-02

    Bonita Bay towers

    High-rise associations with their own submittal sets — elevator phases, sound certificates, quiet hours.

    B-03

    Golf-community ARBs

    Architectural review boards in gated golf communities — packages prepared to pass first review.

    B-04

    Coastal materials

    Salt air and humidity specs for beach-side properties, catalogue defaults for none.

    B-05

    Seasonal scheduling

    Projects planned around your season — leave in May, return to a finished home.

    B-06

    One team, one number

    Designers, builders and permit runners under one roof.

    Kitchen Remodeling in Bonita Springs — questions

    How long does a kitchen remodel take?+

    6–10 weeks of construction for most projects, after 2–4 weeks of design and permitting. Appliance and cabinet lead times are locked during Plan so the build never waits on deliveries.

    What drives the cost of a kitchen remodel?+

    Scope first, finish level second, building type third, access fourth. You receive a written planning range for your specific kitchen at the free design session — before any contract.

    Can you remodel a kitchen in a high-rise condo?+

    Yes — it's a specialty. Board package, elevator reservations, sound-rated flooring and work-hour plans are handled before demo day. Check the HOA Approval Library for your building.

    Do I need to move out?+

    Most clients stay — or are away for the season. We isolate the work zone, protect paths and set up a temporary kitchen station when the layout allows.

    Do you handle permits and inspections?+

    Yes. Collier or Lee County permit sets are prepared and filed by us, and we manage every inspection through final sign-off.

    BEGIN — FREE, NO OBLIGATION

    Your free design session — worth having even if you never hire us.

    Two hours with the people who design and build. You keep the concept board and the written planning range either way.

    NO OBLIGATION · WE REPLY SAME BUSINESS DAY
    (239) 298-4544Free Design Session