Outdoor kitchens built for salt air.
An outdoor kitchen or lanai project in Southwest Florida runs roughly 7–11 weeks depending on scope — marine-grade materials, gas and electrical to code, and Collier or Lee County permits filed by us.
- Construction time
- 7–11 weeks
- Materials
- Marine-grade · coastal-rated
- Permits
- Gas · electric · structure
- Your planning range
- In writing, at the free session
What the scope covers.
Layout & structure
Summer kitchens, islands and bar runs — engineered for wind exposure.
Appliances & gas
Grills, side burners, refrigeration — gas and electrical permitted and inspected.
Counters & cladding
Granite, quartzite and porcelain rated for sun and salt.
Lanai & screening
Screen enclosures, ceilings, fans and lighting tied into the design.
Decking & surfaces
Pool decks and pavers that stay cool and drain right.
Finish & detail
Lighting scenes, storage and the final walkthrough.
Phase by phase, to the week.
Discover
WEEK 0Design
WEEKS 1–4Plan
WEEKS 4–6Build
WEEKS 6–18Follow
THROUGHOUTComplete
FINAL WEEKWhere we build it.
Questions about outdoor kitchen remodeling
Do outdoor kitchens need permits in Collier County?+
Yes — gas, electrical and structural work all require permits. We prepare and file the set and manage inspections through sign-off.
What materials survive salt air?+
Marine-grade stainless, sealed stone and porcelain cladding. We specify from experience, not catalogue defaults.
Your free design session — worth having even if you never hire us.
Two hours with the people who design and build. You keep the concept board and the written planning range either way.
NO OBLIGATION · WE REPLY SAME BUSINESS DAY