Marco Island remodeling, island logistics included.

    SHORT ANSWER

    Remodeling on Marco Island means beachfront buildings and canal homes: salt-air material specs, Collier County permits and island delivery logistics. Condo boards typically review in 3–6 weeks; we file the package and build around your season.

    Permitting authority
    Collier County
    Condo board review
    3–6 weeks typical
    Kitchen / full condo
    6–10 wks / 12–20 wks
    Build season
    May–November
    02

    What changes when you build in Marco Island.

    M-01

    Salt-air specs everywhere

    Every property on Marco is coastal. Hardware, cabinet boxes and sealants chosen to survive it.

    M-02

    Island delivery logistics

    Material staging and delivery windows planned for the bridge, the season and beachfront access rules.

    M-03

    Beachfront board packages

    High-rise associations from South Seas to Cape Marco — approval packages prepared to pass first review.

    M-04

    Collier County permits

    Filed in-house during the Plan phase, inspections managed through final sign-off.

    M-05

    Canal-home realities

    Dock-side access, flood-zone code and elevation rules reviewed before design is final.

    M-06

    One team, one number

    Designers, builders and permit runners under one roof — one accountability for the whole island project.

    03

    Communities we practice in.

    Cape MarcoHIGH-RISE · BEACHFRONT
    South Seas ClubBEACHFRONT · CONDO
    Hideaway BeachGATED · BEACHFRONT
    Tigertail Beach areaCONDO · BEACH
    Marco RiverCANAL · SINGLE-FAMILY
    Estates areaSINGLE-FAMILY · CANAL
    Your building’s rules — HOA Approval Library →

    Remodeling in Marco Island — questions

    Do you work on beachfront condos on Marco Island?+

    Yes — beachfront towers are a specialty: board packages, elevator logistics, sound-rated flooring and work-hour plans handled before demo day.

    How long does a Marco Island remodel take?+

    Kitchens run 6–10 weeks, full condos 12–20 — after design, permitting and typically 3–6 weeks of board review.

    Can you build while we are off-island for the season?+

    Yes — most Marco projects run May through November. Weekly Friday photo updates, approvals by text, walkthrough on your arrival day.

    BEGIN — FREE, NO OBLIGATION

    Your free design session — worth having even if you never hire us.

    Two hours with the people who design and build. You keep the concept board and the written planning range either way.

    NO OBLIGATION · WE REPLY SAME BUSINESS DAY
    (239) 298-4544Free Design Session