Fort Myers remodeling, planned to the week.
Remodeling in Fort Myers means Lee County permitting and a mix of riverfront condos, gated communities and single-family neighborhoods. Kitchens run 6–10 weeks, full remodels 12–20 — with the permit set filed by us.
- Permitting authority
- Lee County
- Condo board review
- where applicable, 3–6 weeks
- Kitchen / full remodel
- 6–10 wks / 12–20 wks
- Build season
- Year-round
What we build in Fort Myers.
Kitchen →
6–10 WEEKSA kitchen remodel in Southwest Florida runs 6–10 weeks of construction after 2–4 weeks of design and permitting.
Bathroom →
4–8 WEEKSA bathroom remodel in Southwest Florida runs 4–8 weeks of construction after design and permitting.
Flooring →
Flooring in Southwest Florida is specified for salt air, humidity and — in condos — sound ratings.
Interior Painting →
Interior painting in Southwest Florida means prep for humidity: sealing, moisture-tolerant systems and clean lines around tile and stone.
Exterior Painting →
1–3 WEEKSExterior painting on the Gulf coast is a coatings problem before it is a colour problem.
Drywall Repair →
Drywall repair in Southwest Florida covers water damage, settling cracks, texture matching and post-storm restoration.
Outdoor Kitchen →
7–11 WEEKSAn outdoor kitchen or lanai project in Southwest Florida runs roughly 7–11 weeks depending on scope — marine-grade materials, gas and electrical to code, and Collier or Lee County permits filed by us.
What changes when you build in Fort Myers.
Lee County permits
Prepared and filed in-house during the Plan phase, inspections managed to sign-off.
Riverfront & gated communities
From McGregor to Gulf Harbour — association packages prepared to pass first review.
Post-storm experience
Wind and water restoration scopes documented for insurance and rebuilt to current code.
One team, one number
Designers, builders and permit runners under one roof.
Communities we practice in.
Remodeling in Fort Myers — questions
Do you serve Fort Myers?+
Yes — Fort Myers is part of our Lee County service area, with the same design-build process and permit handling as our Naples projects.
How long does a Fort Myers remodel take?+
Kitchens run 6–10 weeks, full remodels 12–20 — after design and permitting.
Your free design session — worth having even if you never hire us.
Two hours with the people who design and build. You keep the concept board and the written planning range either way.
NO OBLIGATION · WE REPLY SAME BUSINESS DAY